"...In a typical in-situ reinforced concrete building the formwork and falsework may amount between 35% and 40% of the total cost of the frame. In other types of construction  (e.g. in-situ bridges) the proportion may rise to between 40% and 55%...",  Formwork - A Guide to Good Practice, 3rd Edition.

Our objective is to produce an efficient formwork design that will help RC Frame and Civil Engineering Contractors to reduce costs of construction. We achieve it through our dedicated approach, extensive expertise and attention to detail - because for us the design always comes first.

Welcome to Form First Ltd.

We are members of:

Company Number: 9695825. Registered in England

t: 07935 440 444  e: info@form-first.com      

This website and its content is copyright of Form First Limited © 2019. All rights reserved.

Formwork Design by Form First

Superslim & Alform Formwork Design - Building 600, Porton Down